Featured Project

Elkay Manufacturing

Elkay wanted to create a manufacturing showplace at its 220,000 sq. ft. Broadview facility, which had not been updated since the 1960’s.   However, logistically Elkay could not completely shut down the production lines to accomplish the beautification project.

AAA worked with Elkay to schedule work during off hours so Elkay could maintain productivity during the project.  The collaborative efforts of both professional staffs allowed AAA to complete the project over a 12 week period, working every weekend and a few evenings and holidays.

The final result is a long lasting testimony of AAA’s capabilities given difficult logistics.  AAA’s flexibility in scheduling and availability of experienced crews helped Elkay achieve their desired result—a true manufacturing showplace.

Read the full story

 

Before 
Elkay Manufacturing Industrial Painting Before Elkay Manufacturing Industrial Painting Before
Click to Enlarge Photo Click to Enlarge Photo
 
After
Elkay Manufacturing Industrial Painting After Elkay Manufacturing Industrial Painting After
Click to Enlarge Photo Click to Enlarge Photo
   
Elkay Manufacturing Industrial Painting After Elkay Manufacturing Industrial Painting After
Click to Enlarge Photo Click to Enlarge Photo